Donate using PayPal

si the pie simon

Home

Latest photos

Route signage to Cambridge North.

Upon reviewing footage of some commotion I saw out the corner of my eye this morning, I realise I've caught a cyclist being hit by a driver turning across #CS7 in #Tooting. Hope you're OK, buddy, & got driver's details. Let me know if you n ... [more]

Vehicle parked overhanging the cycle parking buildout (which has lost its protective bollard) - making it harder for us to wheel our bikes in and out of the house.

Bollard damaged and lying in a nearby bush. Reported at: https://highwaysreporting.cambridgeshire.gov.uk/ Reference: 00311822

Planters used as half hearted cycle parking at this pub.

Richard doing the valuable work of measuring the width of the new cycleway. It was four metres.

The designated smoking area for the works.

Richard doing an excellent job of measuring the cycleway- it’s four metres wide here, but note that it’s shared with horse and foot.

As far as I could see these two wheelbenders were the extent of the cycle parking for the crematorium.

This new road with its four metre wide cycleway (shared with horse and foot) provides a viable cycle route to the crematorium.

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://northampton.cyclestreets.net/users/simon/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.